endstream
endobj
startxref
<>
inspected in accordance with the FDOT Sampling Testing and Reporting Guide by Material Description and the FDOT Materials Manual (Topic No. _4hF EnGFmu1p]Z= What are the two items used to describe soil? Excluding Department developed procedures and federal procedures, the remainder of the designation is When density is the what occupying and defying volume? 1 0 obj
For data entry and submittal to FDOT Verifier, actual time up to a maximum of 15 minutes per sample is deemed reasonable. 2023 Field Sampling and Testing Manual; Past Field Sampling & Testing Manual. <>
Which conversion chart is used for limestone? Random number generator with a minimum of 3 increments combined together for the entire width. What requirements need to be followed for standard counts? 4 0 obj
<>
provided in a Materials Bulletin is meant to function as an addendum to the contract documents. ,random
<>
This definition appears somewhat frequently
202 0 obj
<>/Filter/FlateDecode/ID[<70B7C8B731AD604B9BB066F54402AFCA><75BCE5C7E921CE4F90EAF08C6D0C61B5>]/Index[188 22]/Info 187 0 R/Length 75/Prev 35368/Root 189 0 R/Size 210/Type/XRef/W[1 2 1]>>stream
How often is the tester to be calibrated? %
3) More than 30 ft from another gauge Document report findings. <>/Metadata 152 0 R/ViewerPreferences 153 0 R>>
Use containers that preclude sample loss, contamination, or damage and attach sample identification. The numerical prefix gives the parent method. endstream
endobj
189 0 obj
<. 4 0 obj
Florida Method of Test for Sampling Aggregates Designation: FM 1-R 090 FM 1-R 090 is identical to AASHTO R 90-18 except for the following provisions: 1. FDOT605 Suwannee St.Tallahassee, FL 32399Phone: (850) 414-4100Customer Service Portal. No specific time; At least 1 min; At least 3 min Postal codes: USA: 81657, Canada: T5A 0A7. If the material fails, the Contractor or the PA may request the DMRO representative to return to the pit for a follow-up sampling process. Density Logbook (Links to FDOT Construction Office) E - F . District Laboratory Testing. Modified (used for subgrade and MSE walls) and Standard (used for embankment and structure). {^ !S|40ZJf)
Y f`.Qf,)\*%R\\U l PU\#8?uJ/@ w
BL1S(-[)FFRH6oj./)*o5-TU#M3ugKqFuuVYJ|~S_5v{zMu oG;vuWl6N+.-[h5Tk~Te*.Ya{'bG|[=,%Ot?RAg9s to be used on the project as a Job Guide Schedule in the same format as the current Sampling, Testing, and Reporting Guide 21 calendar days prior to commencement of . A copy of what should be kept from the log? 390 0 obj
<>stream
hb``` The program covers sampling procedures, testing procedures, and testing equipment. Examples: NFL,
for both the STRG and the JGS can both be found on the MAC page and then going to the training section. <>
=_x~K3ZYNz+Ghh_2> F!T|Ikia|3Yc=iG-qN-g`&x. Earthwork Density Report is used to record what? endobj
endobj
}q}5RI@:p|IHqDUW&nO38-FVjpyV{Is0nUIufP79U
\ x .0E-?`-x{{_.V[+zsB9m9ey2~F fI^UMM}
lqtS{l]r-265jy\eETm\9YplseqX@Lww[E7 *Or until stabilized*. Materials and Research Division Testing. 2/10). equipment. Florida Sampling furthermore Testing Methods (FSTM) Forms - Commercial Inspection . Florida Sampling and Testing Method Revised: June 11, 2020 Florida Test Methods 10-1-2 source Sampling, Testing and Reporting Guide (STRG). What is produced from the chemical reaction from the Speedy Moisture Test? There are many MAC Specs and these are complex entries. xYPXP(-Y^%mq_y.TUn.H GUU&q^GyVueuOIw_?E_~7~M_o(M~U%4UREz_Jk^E~/FyQVfPE#NI Ju&dW^.Rt*.I:`IQr2DK~h`"L" It is designed to give details to Department representatives for administering These documents contain the national/industry standards for the sampling and testing of materials. The DMRO will test the material and report the results in the Department's database. Construction TrainingThe Departments Construction Training Current Field Sampling & Testing Manual. 1 0 obj
What is the tolerance of difference permitted for Density Standard Counts? %
3 0 obj
What should be entered each time equipment is compared? 0
Density Log Book SoftwareThe Density Log Book Plot is a program which will prepare "global warming"
Acronym Finder, All Rights Reserved. Soil Dns. Sea p{b O/5V)^Zp%S0 d.C)10j@r 2
/J]|BN3`00if ,&c7h` H4s
19. Sampling Tube-Plastic, aluminum or similar tube, six-feet long with a 1 1/4-inch diameter." 2. >> 4. George RobinsonTest Pit 352-955-6320 Kyle Sheppard 352-955-6311 Note: All samples that are delivered prior to 5:00 PM will be routed to the appropriate laboratory on the same day as delivery. Materials ManualThe Materials Manual (MM) contains instructions needed to complete the Quality Assurance and Materials Acceptance portion of Department of Transportation contracts. Testing and Field Testing Professional (PDF-144KB) M - N . %PDF-1.5
%
Quality Control record and a separate Verification record. If a gauge is calibrated or repaired during construction, what spec should be followed? Both the STRG and the Job Guide Schedule (JGS) are now part of the MAC application. For questions for concerns regarding the information contained within these documents, please contact the related State Materials Office technical Purchase a Crash Report; REAL ID Information Driver Services Drivers License Online Renewal Motor Vehicle Motor Vehicle Online Renewal Education Media and Events Press Releases Plans, . 5.1.5.3 Sampling Testing and Reporting Guide (STRG) 5.1.5.3.1 General Information The STRG is an online report from the Department's Materials Acceptance and Certification (MAC) system that is often referred to as the SAMPLING GUIDE. Forms - Official FDOT Forms (Links up FDOT Shapes and Courses Office) Forms - Sample Authentication. /Filter /FlateDecode Materials Manual Section 5.5Section 5.5 describes the necessary activities for Department personnel as it relates to the Independent Assurance (IA) evaluation program.
2) Steel balls 2022 Field Sampling and Testing Manual; xWnJ}G#TeE*D6,8@uu?k)C x~Lsz>gy>|']:O|'o$v+[Ic%F%LzhhTLQrFhiBZ-!#4i!*v>Z2-)vy,2U2>Yq#E pn(WrT6+C.aCn/w1n/n.|$ yk(.@ KD1%IIZX noJr(4_[Qvc6?:}yZiCU3,wNW+X3_eYP5Y7mF^$}^6y1=
3M/}}$g{ro5'v4&"q1 c1FYOlFb/MN14n/:Al_`l+wL_`C~1~R6=~Fw0t{c. 1) Calibrate within last 12 months 3 0 obj
Which materials require the use of the steel balls when performing the test? endstream
endobj
370 0 obj
<. 1 0 obj
2 0 obj
Test Depth: Write the test depth in inches (millimeter). Instructions for both the STRG and the JGS can both be found on the MAC page and then going to the training section. %
%%EOF
Who performs the tests and collects the samples? The following information has been provided to guide you in the materials acceptance process. %%EOF
<>/Metadata 259 0 R/ViewerPreferences 260 0 R>>
By doing this daily, we can detect inconsistencies early enough to make a difference. Labor associated with test reporting is a unique pay item, and is not included in the cost of the test. When the moisture is too high, what do you do? 675-000-000). Instructions 10 days of submittal Rerun the test with 1/2 and multiply the results by 2. Word(s) in meaning: chat
0
Sampling Testing and Reporting Guide (STRG). What is the recording accuracy required for % Maximum Density Content? Independent Assurance Performance Sample Schedule (PDF-33KB) Independent Assurance Proficiency Sample Test Reports. Examples of Acceptable Certification . The point of Quality control inspection, sampling, and testing is to. Soil Mst. 3 0 obj
stream
Lift Number: Enter the lift number and total lifts at the test location (i.e. What is a single lift of finished material compacted not to exceed 500 feet? To provide a standard procedure for the proper sampling, logging, and storage of representative materials obtained for laboratory testing during roadway construction; provides a uniform method of guiding the sampling and testing. /Length 5 0 R FDOT Standard Specifications for Road and Bridge Construction (including all modifications such as supplemental and special provisions) must be You can find recent press releases, public notices, media contacts, links x\Ys6~L&.'G]eh%NlI~DD sht7 eOT 9R
/X#&7{L.~8{O''==%fBl5+o3xnzpr6`=vPAl01>G9Q&l{!v}|hPNO{_JVf( KWVWf *4H\`&d0ax9gBVj+kP~CaZKjiY9^=SACL 2) More than 10 ft from large objects Sample, sample size, and sample frequency can be found where? Feedback, The World's most comprehensive professionally edited abbreviations and acronyms database, https://www.acronymfinder.com/Sampling%2c-Testing-and-Reporting-Guide-(Florida-Department-of-Transportation)-(STRG).html, Safe Time for Recreation, Enrichment and Tutoring for Children (Chula Vista, CA), Storage and Retrieval by Content of Imaged Documents (European Strategic Program for Research in Information Technology), Storm Transfer and Response Experiment (National Oceanic and Atmospheric Administration), Science and Technologies of Russian Federation (Moscow, Russia), South Texas Research Facility (University of Texas; San Antonio, TX), Spectro-Temporal Receptive Field (auditory system), Storage Tank Registration Form (Florida Department of Environmental Protection), Spatio Temporal Region Graph (video indexing), Steuerung (German: Control, instead of CTRL on German keyboards), Submarine Tactical Requirements Group (US Navy), Statement of Total Recognised Gains and Losses. and is found in the following Acronym Finder categories: The Acronym Finder is
%PDF-1.6 Can the Density be more than 100% of Maximum Dry Density reported in the Proctor Test? Aggregate? What is a layer of material of not more than 6 inches compacted thickness for full width where a sample is gotten from? Perform Independent Assurance tests with equipment other than that used by the project personnel. 4) Sample. Using the Guide Schedule Research of sampling and testing rates listed for project tests in the following Guide Schedule show that the Department's and the Contractor's risk of either rejecting "good" material or accepting "bad" material range from 20% to 40%. 7 days How many days does the Engineer/The Department have to approve the QC plan? As needed by hand plotting prior to construction. 2. Sampling, Testing and Reporting Guide (STRG) The STRG provides information on the frequency of the sampling and testing of materials. Daily standard counts are recorded in the? Please contact your Data Center prior to beginning the installation process. The reduction of voids creates what kind of changes in the material? PROCEDURE Record all information on SFN 9987 or SFN 2455. What is required in order to permit the use of the moisture content from the nuclear density gauge? Materials BulletinsThe information Experimental Project Reports . Labor associated with test reporting is a unique pay item, and is not included in the cost of the test. 105-1.1.1 Submission of Materials Certification and Reporting Test Results: Submit certifications prior to placement of materials. endstream
endobj
1384 0 obj
<>/Metadata 124 0 R/PageLayout/OneColumn/Pages 1375 0 R/StructTreeRoot 189 0 R/Type/Catalog>>
endobj
1385 0 obj
<>/Font<>/ProcSet[/PDF/Text]>>/Rotate 0/StructParents 0/Type/Page>>
endobj
1386 0 obj
<>stream
What do you do if lumps are found in the residue? stream
<>/ExtGState<>/XObject<>/ProcSet[/PDF/Text/ImageB/ImageC/ImageI] >>/MediaBox[ 0 0 612 792] /Contents 4 0 R/Group<>/Tabs/S/StructParents 0>>
Both the STRG and the Job Guide Schedule (JGS) are now part of the MAC application. What is the weight of material occupying a unit volume? 369 0 obj
<>
endobj
x[Ks8*Gi+SSxc!"6wlh (L[SHTh4~G'Z_Nv/G.fl89}y^X,)xqYVyrqD}*gYrMJ,d\>W? hbbd``b`$g- "qDp'"rA~&FF 7!@ [
It should not stop standardizing after sitting in the sun. 4 0 obj
Standard counts are generally taken how often? <>
Submit one sample of Updating <>>>
3) Perform density test What is the purpose for the Sampling, Testing, and Reporting Guide? What test is a laboratory test which establishes a density standard that a Contractor must achieve a certain percent of, in the field for a given material? endobj
Aggregate SourcesA listing of sources with accepted quality control plans. 18. endobj
Control the level of quality being produced in the end product. To test the actual materials that are in the field. Sampling, Testing and Reporting Guide (STRG)The STRG provides information on the frequency of the sampling and testing of materials. What does Speedy Moisture Test determine? What is the recording accuracy required for Wet Density? This Manual ensures consistency in carrying out Department policies to ensure that the quality of all materials Will leaving the gauge in the sun stop it from working? %PDF-1.7
Quality Control Program Checklist - Materials Manual Section 5.6This document is a step-by-step guideline for the development of an effective Quality Control Program. To order copies, please visit:http://www.astm.org/http://www.transportation.org/aashto/home.nsf/FrontPage. How many minutes do you allow a gauge to warm up? Advanced Manual. PSP, HIPAA
Report test results at completion of the test . The QC plan must be submitted, by the contractor, how many days prior to starting work on any QC material? Moisture acts as a lubricant in the soil material thus permitting what? 7.0 Reporting Test Results: Enter test results into Department database within 24 hours of test completion. 2 0 obj
Test specimen shall be a representative sample based on the following table. 188 0 obj
<>
endobj
When logging data, how should lines for each gauge used on the project be completed? What is the recording accuracy required for Moisture Content? When sampling material from the roadway, what is the minimum number of samples taken to be combined to form the representative sample? Count: - Record the soil density count reading. stream
Density Log Book for use on projects in the state of Florida. 17. {'t-9>e,ys >-eFy*YUE1,:Z"CPa9_,y8^pW)g| /g')9rcZ/ygySw\K"?f;mT. %PDF-1.7
UB0>pNQH5z~om"j
D b!:XmUAza(}]dGxg9vHv/jXaqg9-^'-+jt&Smf.Z3Cb[RPbmY_u Ki/C!`H-]HUgCJK{L#[}#O%@r.g P2q&hl^0(4'K.jq>t The intention is to retrieve a sample of each type of material; many types are brought onto or found on the job. ZY{S\oQ0R8t1t
\!II5\65r;kgV"S9@(dC2kj.jZks n[w-%W=bvKQ%g_s/0M Some are for the review and approval of asphalt or concrete mix designs. 2) Run daily standard counts SpecificationsStandard Specifications for Road and Bridge Construction.
G - EFFERVESCENCE 4 (4.75 mm) or smaller 300 g 3/8" (9.5 mm) 1000 g 3/4" (19.0 mm) 2500 g 1" (37.5 mm) 5000 g The sample size required for this test is a minimum after drying. - NOTE: If thick lift operations are used, indicate the Standard 6-inch lift numbers (i.e. When preparing the test surface, voids exceeding what depth are to be filled? endobj
What is LIMS? and Qualification program is administered through the State Construction Training Office. Sampling is determined how generated with random numbers usually by a Verification Inspector What is important about sampling at the roadway Minimum of three representative sample combined. endobj
|R?"H Some MAC Specs do not apply to project acceptance, like those created for entering and tracking program samples. Please verify that all packages are labeled correctly to ensure delivery to the correct laboratory (see the attached information). Nominal Maximum Size Minimum Mass No. 4) Must be placed on asphalt, concrete, or >100 pcf material. Single line strikethrough, corrected data written close to it, and initialed. How many times can standard counts be redone? When using an approved gauge on FDOT project? <>
How do you remove the rod from the ground? 382 0 obj
<>/Filter/FlateDecode/ID[<03B4A067E22DAC47B351D21B7F08D34E><0CBC8C23913E474D9D991107FB65B9D6>]/Index[369 22]/Info 368 0 R/Length 72/Prev 89473/Root 370 0 R/Size 391/Type/XRef/W[1 2 1]>>stream
<>/ExtGState<>/XObject<>/ProcSet[/PDF/Text/ImageB/ImageC/ImageI] >>/MediaBox[ 0 0 612 792] /Contents 4 0 R/Group<>/Tabs/S/StructParents 0>>
Smash Karts Hack Script,
Articles F